Montgomery County Custom Swimming Pool Construction Schedule - Magnolia, TX
DAY 1 - March 11th, 2010
Spring Pool begins the construction of a geometric swimming design. The design includes a seven foot raised spa with a flagstone cascading spillway, a tanning ledge with two fountains, and a raised swimming pool beam. The deck is designed to circle the pool and will step up to follow the raised pool beam.
Creekside Park Custom Swimming Pool Construction Schedule - The Woodlands, TX
DAY 1 - March 2 2010
Beautiful weather to start construction on a swimming pool. Despite the rain yesterday, we were able to find a dumpsite we could get into to dump the dirt excavated from the pool. We left as much "good" dirt at the site as possible to help with the decking area around the pool. The backyard has a slope to it. Because of the slope, the deck and the pool in part of the yard are above the actual grade. Spring Pools has to build up the grade to a level even with the back patio.
Spring Trails Custom Swimming Pool Construction Schedule - Spring, TX
DAY 1 - February 16th, 2010
Finally a break in the weather to start Spring Pools first swimming pool for the year. A geometeric pool with a raised beam and two 3' sheer descents. The pool will also have a round spa raised 6" above a pea gravel deck.
Auburn Lakes Swimming Pool Construction Schedule - Spring, TX
DAY 1 - November 25th, 2009
Excavation began today on a custom built gunite swimming pool in Auburn Lakes, Spring, TX. The pool will have a 7' round spa raised 18", with a 4 function spa side switch. It will include a tanning ledge with two fountains and a moss rock waterfall with five weepers. Spring Pools will also be installing an Outdoor Kitchen complete with gas bar-b-que, sink, and refrigerator. The deck area around the spa will be raised six inches and have a gas fire pit.
Champions Swimming Pool Construction Schedule - Spring, TX
DAY 1 - August 13th, 2009
Broke ground on another summer custom swimming pool. Today went very well in spite of the threat of rain. Spring Pools got an early start on excavation. This allowed for the steel and the stub plumbing to be installed in the pool as well. All in the same day!