Auburn Lakes Custom Swimming Pool Construction Schedule - Spring, TX

DAY 1 - November 25th

Excavation began today on a custom built gunite swimming pool in Auburn Lakes, Spring, TX. The pool will have a 7' round spa raised 18", with a 4 function spa side switch. It will include a tanning ledge with two fountains and a moss rock waterfall with five weepers. Spring Pools will also be installing an Outdoor Kitchen complete with gas bar-b-que, sink, and refrigerator. The deck area around the spa will be raised six inches and have a gas fire pit.

Read more...
 

Alden Bridge Custom Swimming Pool Construction Project - The Woodlands, TX

DAY 1 - July 13th Excavation

Started construction on an unique custom pool design. The pool was designed to incorporate an existing wood deck. Given the utility easement and the desire to have the spa positioned off the deck and a large entry for their daughter, the spa is going to be built within the pool entry. The first step will wrap around the spa, the second step will also be a large bench next to the spa.

img_0635r img_0638r

img_0639r img_0640r

 

DAY 2 - July 14th Steel & Stub Plumbing

img_0642r img_0643r

img_0644r img_0646r

 

DAY 3 - July 15th Gunite

img_0647r img_0648r

img_0651r img_0652r

img_0657r img_0658r

 

DAY 4 - July 16 Plumbing

What a hot day. Temperature hovering near 100 degrees. The Spillers have been very kind in offering everbody plenty to drink. The Plumber and his crew were able to brave the heat and install all the plumbing, equipment and run the gas line in just over a day. Thanks everybody.

img_0660r img_0662r

img_0665r img_0666r

 

DAY 5 - July 17 Electrical

The electrical system for the pool was installed. Trenches were inspected, then backfilled.

img_0670r img_0674r

 

DAY 6 & 7 - July 18 & 19 Weekend (No Work Scheduled)

Gunite being watered.....To keep from Cracking!

img_0675r img_0677r

 

DAY 8 - July 20 (Rain Delay)

DAY 9 - July 21 Tile, Coping & Rock

Rock work along with tile and coping is started today. Depending on the size and complexity, the work can take several days. The Spillers chose to have flagstone waterline tile and flagstone coping. The pool also has a mini waterfall and seven weepers. The weeping rock is set into the beam of the pool wall to a point below the waterline. This design gives the pool a barrier from the yard, keeping unwanted debris out of the pool. This design also allows the pool to be placed next to the utililiy easements, allowing for a larger pool in a smaller backyard. The deck area is maximized between the house and the swimming pool.

img_0680r img_0685r

img_0686r img_0684r

 

DAY 10 - July 22 Tile, Coping & Rock

Fininshed setting the moss rock for the Waterfall and Weeping Rock. Also, the Tile and Coping was fininshed being installed. What a beautiful water feature on a free form pool. The flagstone tile and coping accents the moss rock very well.

img_0692r img_0693r

img_0694r img_0696r

 

DAY 11 - July 23rd Deck

The deck for the pool is started. The deck is laid out. The drains are installed. The steel is set into place.

img_0697r img_0700r

img_0699r img_0702r

 

DAY 12 - July 24 Deck

The pea gravel deck is poured, floated, and finished. We added an umbrella sleeve in the deck so the Spillers could shade themselves by the pool. The deck was poured level to the existing wood deck for an easy transition.

img_0704r img_0706r

img_0707r img_0708r

 

DAY 13 - July 25 Pebble Sheen

The pool is prepped for Pebble Sheen. The Spillers decided on Blue Granite Pebble Sheen. Pebble Sheen has a smaller aggregate than Pebble Tec, but the application process is the same.

DAY 14 - July 26 Sunday (No Work Scheduled)

DAY 15 - July 27 Pebble Sheen

The Pebble is installed in the pool. It has a milky coating that will be acided washed.

img_0711r img_0713r

 

DAY 16 - July 28 Pebble Sheen

The Pebble Sheen is acid washed. The pool return fittings are installed. The pool is then filled with water.

img_0719r img_0723r

 

Three Weeks Later....Another Custom Built Inground Gunite Swimming Pool Construction Project Completed by the Contractors at Spring Pools.

img_0785r

img_0789r

spillersr

 

Custom Swimming Pool Construction Schedule - The Woodlands, TX

DAY 1 - June 10th

Broke ground on a freeform custom inground gunite pool in The Woodlands, TX. The pool design includes a beach entry top with flagstone and a three and a half ton moss rock waterfall with weepers. The swimming pool also will have a custom kidney shaped spa, raised 18", with seven spa jets. The rest of the details to follow.....

jsw_img_0463 jsw_img_0464

 

DAY 2 - June 11th

Finish installing the steel and stub plumbing by noon. Modern Method Gunite started and finished by late afternoon.

jsw_img_0465 jsw_img_0468

jsw_img_0471 jsw_img_0474

 

DAY 3 - June 12th

The customer has an energy efficient Pentair varible speed pump installed for the pool and spa. This allows for lower flow rate for filtrating the pool, while also allowing for a higher flow rate when operating the spa. This along with a Pentair cartridge filter and 400,000 btu heater is standard equipment with Spring Pools. The plumber starts on day 3 with temperatures reaching near 100 degrees. Progress is slowed, but will still be completed in two days.

jsw_img_0478 jsw_img_0476

 

DAY 4 - June 13th

Plumbing finished.

jsw_img_0491 jsw_img_0489

 

DAY 5 - June 14th

Sunday - No Work Scheduled

 

DAY 6 - June 15th

Electrical work is completed. Trenches are inspected and passed by Nesbit Inspections.

js_img_0498 js_img_0499

 

DAY 7 - June 16th

Trenches are backfilled. Tile and Coping work is started. The coping around the pool is Oklahoma flagstone. The customer chose a 1" ceramic mosiac tile for the waterline of the pool.

js_img_0501 js_img_0503

 

DAY 8 - June 17th

Tile and Coping continues. Moss rock waterfall is started.

js_img_0504 js_img_0507

js_img_0511 js_img_0512

 

DAY 9 - June 18th

The Tile, Coping and Rock work is finished. The customer requested some slight modifications to the amount of rock vs tile and coping to the pool. There was more tile and coping and less rock when it was all said and done. The beach entry will have an sleeve in the flagstone for an umbrella.

js_img_0513 js_img_0515

js_img_0518 js_img_0519

 

DAY 10 - June 19th

Made some changes to the deck layout. Enlarged the Pergola area, and curved the steps more. No other work scheduled.

js_img_0520 js_img_0521

js_img_0522 js_img_0523

 

DAY 11, 12 & 13 - June 20th, 21st, & 22nd

No Work Scheduled

 

DAY 14 - June 23rd

Finished forming up deck and installing drains. There will be four steps from the covered patio area down to the main deck. The steps will be trimmed in flagstone. The deck will be of pea gravel and have flagstone inlays.

js_img_0556 js_img_0554

js_img_0557 js_img_0558

js_img_0550 js_img_0551

 

DAY 15 - June 24th

No Work Schedule - Concrete Scheduled for Tomorrow

DAY 16 - June 25th

Last minute changes to deck. Customer decided to have Spring Pools build the retaining wall for the landscaping beds between the house and pool. Poured concrete and floated deck. Pea gravel deck, with flagstone inlays.

js_img_0568 js_img_0571

js_img_0579 js_img_0580

js_img_0584 js_img_0586

 

DAY 17 - June 26th

The Teels are having Pebble Tec installed as the lining for their pool. Spring Pools contracts with Modern Method to install Pebble Tec and Pebble Sheen. Today the pool is being prepped for Caribbean Blue Pebble Tec.

js_img_0588 js_img_0589

 

DAY 18 - June 27th

Pebble Tec is applied. It needs to harden before it can be acid washed.

img_0594r img_0595r

DAY 19 - June 28th

Sunday. No worked scheduled.

 

DAY 20 - June 29th

Acid washed the Pebble Tec. Began filling the pool.

 

DAY 21 - June 30th

Finished filling the swimming pool with water. Pool Start Up Begins..... Time to Set Up Pool School!!!

img_0597r img_0598r

 

30 Days Later.... Another Custom Built Inground Gunite Swimming Pool Construction Project Completed by the Contractors at Spring Pools.

img_0741

img_0738

Landscaping by New Image Landscaping.

 

 

 

Morgan Custom Swimming Pool Construction Schedule - The Woodlands, TX

DAY 1 - April 24th

Broke ground on a smaller custom pool in The Woodlands, TX. The pool design includes a mutli-level raised beam with three sheer decents. It has a 7' round spa, raised 6", with seven spa jets. The rest of the details to follow.....

Read more...
 

Fleming Custom Swimming Pool Construction Schedule - Spring, TX

DAY 1 - APRIL 13th

Excavation began today on a custom built gunite swimming pool. The pool will have a kidney shaped spa with a small waterfall flowing into it. It will include a custom built gunite slide and larger moss rock waterfall. The pool also will have a 12" raised beam with two 3' sheer descents.

Read more...