Alden Bridge Custom Swimming Pool Construction Project - The Woodlands, TX

DAY 1 - July 13th Excavation

Started construction on an unique custom pool design. The pool was designed to incorporate an existing wood deck. Given the utility easement and the desire to have the spa positioned off the deck and a large entry for their daughter, the spa is going to be built within the pool entry. The first step will wrap around the spa, the second step will also be a large bench next to the spa.

img_0635r img_0638r

img_0639r img_0640r

 

DAY 2 - July 14th Steel & Stub Plumbing

img_0642r img_0643r

img_0644r img_0646r

 

DAY 3 - July 15th Gunite

img_0647r img_0648r

img_0651r img_0652r

img_0657r img_0658r

 

DAY 4 - July 16 Plumbing

What a hot day. Temperature hovering near 100 degrees. The Spillers have been very kind in offering everbody plenty to drink. The Plumber and his crew were able to brave the heat and install all the plumbing, equipment and run the gas line in just over a day. Thanks everybody.

img_0660r img_0662r

img_0665r img_0666r

 

DAY 5 - July 17 Electrical

The electrical system for the pool was installed. Trenches were inspected, then backfilled.

img_0670r img_0674r

 

DAY 6 & 7 - July 18 & 19 Weekend (No Work Scheduled)

Gunite being watered.....To keep from Cracking!

img_0675r img_0677r

 

DAY 8 - July 20 (Rain Delay)

DAY 9 - July 21 Tile, Coping & Rock

Rock work along with tile and coping is started today. Depending on the size and complexity, the work can take several days. The Spillers chose to have flagstone waterline tile and flagstone coping. The pool also has a mini waterfall and seven weepers. The weeping rock is set into the beam of the pool wall to a point below the waterline. This design gives the pool a barrier from the yard, keeping unwanted debris out of the pool. This design also allows the pool to be placed next to the utililiy easements, allowing for a larger pool in a smaller backyard. The deck area is maximized between the house and the swimming pool.

img_0680r img_0685r

img_0686r img_0684r

 

DAY 10 - July 22 Tile, Coping & Rock

Fininshed setting the moss rock for the Waterfall and Weeping Rock. Also, the Tile and Coping was fininshed being installed. What a beautiful water feature on a free form pool. The flagstone tile and coping accents the moss rock very well.

img_0692r img_0693r

img_0694r img_0696r

 

DAY 11 - July 23rd Deck

The deck for the pool is started. The deck is laid out. The drains are installed. The steel is set into place.

img_0697r img_0700r

img_0699r img_0702r

 

DAY 12 - July 24 Deck

The pea gravel deck is poured, floated, and finished. We added an umbrella sleeve in the deck so the Spillers could shade themselves by the pool. The deck was poured level to the existing wood deck for an easy transition.

img_0704r img_0706r

img_0707r img_0708r

 

DAY 13 - July 25 Pebble Sheen

The pool is prepped for Pebble Sheen. The Spillers decided on Blue Granite Pebble Sheen. Pebble Sheen has a smaller aggregate than Pebble Tec, but the application process is the same.

DAY 14 - July 26 Sunday (No Work Scheduled)

DAY 15 - July 27 Pebble Sheen

The Pebble is installed in the pool. It has a milky coating that will be acided washed.

img_0711r img_0713r

 

DAY 16 - July 28 Pebble Sheen

The Pebble Sheen is acid washed. The pool return fittings are installed. The pool is then filled with water.

img_0719r img_0723r

 

Three Weeks Later....Another Custom Built Inground Gunite Swimming Pool Construction Project Completed by the Contractors at Spring Pools.

img_0785r

img_0789r